| 1 |
MEMBEKAL DAN MEMASANG IRRIGATION AND VERTICAL HYDROPONICS SYSTEM FOR CONTROLLED ENVIRONMENT FACILITIES (CEF) UNTUK PROJEK CADANGAN PEMBANGUNAN PHYSICAL CAPEX FASA 2 SABAH AGRO INDUSTRIAL PRECINT - SABAH DEVELOPMENT CORRIDOR SAIP-SDC |
SABAH ECONOMIC DEVELOPMENT AND INVESTMENT AUTHORITY |
1,691,768.48 |
COMPLETED |
| 2 |
MEMBEKAL DAN MEMASANG LABORATORY FURNITURES AND METAL FURNITURE DI BLOK CADANGAN RESEARCH & ENGINEERING PRODUCTION LINE FACILITY AND POST HARVEST HANDLING FACILITY UNTUK CADANGAN PEMBANGUNAN PHYSICAL CAPEX FASA 2 SABAH AGRO INDUSTRIAL PRECINT - SABAH DEVELOPMENT CORRIDOR SAIP-SDC |
SABAH ECONOMIC DEVELOPMENT AND INVESTMENT AUTHORITY |
634,293.40 |
COMPLETED |
| 3 |
MEMBEKAL DAN MEMASANG MODULAR SYSTEM FOR CLEANROOM UNTUK PHARMACEUTICALS DAN FOOD PROCESSING DI BLIK PRODUCTION LINE FACILITIES UNTUK PROJEK CADANG PEMBANGUNAN PHYSICAL CAPEX FASA 2 SABAH AGRO INDUSTRIAL PRECINT - SABAH DEVELOPMENT CORRIDOR SAIP-SDC |
SABAH ECONOMIC DEVELOPMENT AND INVESTMENT AUTHORITY |
2,598,048.28 |
COMPLETED |
| 4 |
MEMBEKAL DAN MEMASANG PHARMACEUTICAL EQUIPMENT DI BLOK PRODUCTION LINE FACILITIES UNTUK PROJEK CADANGAN PEMBANGUNAN PHYSICAL CAPEX FASA 2 SABAH AGRO INDUSTRIAL PRECINT - SABAH DEVELOPMENT CORRIDOR SAIP-SDC |
SABAH ECONOMIC DEVELOPMENT AND INVESTMENT AUTHORITY |
1,759,191.90 |
COMPLETED |
| 5 |
MEMBEKAL DAN MEMASANG GEOSPATIAL SYSTEM FOR PRECISION AGRICULTURE UNTUK PROJEK CADANGAN PEMBANGUNAN PHYSICAL CAPEX FASA 2 SABAH AGRO INDUSTRIAL PRECINT - SABAH DEVELOPMENT CORRIDOR SAIP-SDC |
SABAH ECONOMIC DEVELOPMENT AND INVESTMENT AUTHORITY |
246,199.84 |
COMPLETED |
| 6 |
MEMBEKAL DAN MEMASANG FOOD PROCESSING AND POST HARVEST PROCESSING AND PACKAGING UNTUK PROJEK CADANGAN PEMBANGUNAN PHYSICAL CAPEX FASA 2 SABAH AGRO INDUSTRIAL PRECINT - SABAH DEVELOPMENT CORRIDOR SAIP-SDC |
SABAH ECONOMIC DEVELOPMENT AND INVESTMENT AUTHORITY |
2,646,134.55 |
COMPLETED |
| 7 |
MEMBEKAL DAN MEMASANG LAB EQUIPMENT AND LAB GLASSWARE AND PLASTICWARE UNTUK PROJEK CADANGAN PEMBANGUNAN PHYSICAL CAPEX FASA 2 SABAH AGRO INDUSTRIAL PRECINT - SABAH DEVELOPMENT CORRIDOR SAIP-SDC |
SABAH ECONOMIC DEVELOPMENT AND INVESTMENT AUTHORITY |
3,478,387.35 |
COMPLETED |
| 8 |
MEMBEKAL DAN MEMASANG PERALATAN TAMBAHAN DAN AKSESORI BAGI LAB EQUIPMENT AND LAB GLASSWARE AND PLASTICWARE UNTUK PROJEK CADANGAN PEMBANGUNAN PHYSICAL CAPEX FASA 2 SABAH AGRO INDUSTRIAL PRECINT - SABAH DEVELOPMENT CORRIDOR SAIP-SDC |
SABAH ECONOMIC DEVELOPMENT AND INVESTMENT AUTHORITY |
859,370.00 |
COMPLETED |
| 9 |
MEMBEKAL DAN MEMASANG PERALATAN TAMBAHAN DAN AKSESORI BAGI “FOOD PROCESSING AND POST HARVEST PROCESSING AND PACKAGING” UNTUK PROJEK CADANGAN PEMBANGUNAN FASA 2 SABAH AGRO INDUSTRIAL PRECINT - SABAH DEVELOPMENT CORRIDOR SAIP-SDC |
SABAH ECONOMIC DEVELOPMENT AND INVESTMENT AUTHORITY |
796,490.00 |
COMPLETED |
| 10 |
MEMBEKAL DAN MEMASANG PERALATAN TAMBAHAN DAN AKSESORI BAGI PHARMACEUTICAL EQUIPEMENT DI BLOK PRODUCTION LINE FACILITIES UNTUK PROJEK CADANGAN PEMBANGUNAN PHYSICAL CAPEX FASA 2 SABAH AGRO INDUSTRIAL PRECINT - SABAH DEVELOPMENT CORRIDOR SAIP-SDC |
SABAH ECONOMIC DEVELOPMENT AND INVESTMENT AUTHORITY |
538,950.00 |
COMPLETED |
| 11 |
CADANGAN PEMBANGUNAN PHYSICAL CAPEX FASA 2 SABAH AGRO INDUSTRIAL PRECINT - SABAH DEVELOPMENT CORRIDOR SAIP-SDC |
SABAH ECONOMIC DEVELOPMENT AND INVESTMENT AUTHORITY |
15,883,388.95 |
COMPLETED |
| 12 |
CADANGAN PEMBANGUNAN PHYSICAL CAPEX FASA 1 SABAH AGRO INDUSTRIAL PRECINT - SABAH DEVELOPMENT CORRIDOR SAIP-SDC DI DAERAH PAPAR, SABAH (EARTHWORK) |
SABAH ECONOMIC DEVELOPMENT AND INVESTMENT AUTHORITY |
4,560,199.00 |
COMPLETED |
| 13 |
CADANGAN PEMBANGUNAN PHYSICAL CAPEX FASA 1 SABAH AGRO INDUSTRIAL PRECINT -SABAH DEVELOPMENT CORRIDOR SAIP-SDC DI DAERAH PAPAR, SABAH (ADMIN BUILDING BLOCK) |
SABAH ECONOMIC DEVELOPMENT AND INVESTMENT AUTHORITY |
2,501,485.00 |
COMPLETED |
| 14 |
PROPOSED RENOVATION, REFURBISHMENT & UPLIFTING WORKS FOR HOTEL SERI PERKASA ON LOT 8, 9, 10 & 11 (GROUND FLOOR) & LOT 9, 10 & 11 (1ST, 2ND & 3RD FLOOR), BLOCK A KOMPLEKS SEDCO, KG AIR, JALAN LAIMANDIKI, 88000 KOTA KINABALU |
PERKASA HOLDING SDN BHD |
3,505,000.00 |
COMPLETED |
| 15 |
CADANGAN MEMBINA DAN MENYIAPKAN PROJEK SEKOLAH MENENGAH KEBANGSAAN BANDAU DI DAERAH KOTA MARUDU SABAH |
KEMENTERIAN PENDIDIKAN MALAYSIA |
34,301,107.36 |
COMPLETED |
| 16 |
CADANGAN PELAKSANAAN PROJEK PEMBANGUNAN PENDIDIKAN RMKe-9 KEMENTERIAN PELAJARAN MALAYSIA PROJEK KHAS (DEWAN SEKOLAH, TANDAS SEKOLAH, PEJABAT GURU DAN PADANG SEKOLAH) PAKEJ 9 (SABAH) SUB-PAKEJ 1- KOTA KINABALU |
KEMENTERIAN PENDIDIKAN MALAYSIA |
2,213,556.22 |
COMPLETED |
| 17 |
CADANGAN PELAKSANAAN PROJEK PEMBANGUNAN PENDIDIKAN RMKe-9 KEMENTERIAN PELAJARAN MALAYSIA PROJEK KHAS (DEWAN SEKOLAH, TANDAS SEKOLAH, PEJABAT GURU DAN PADANG SEKOLAH) PAKEJ 9 (SABAH DAN W.P LABUAN) SUB-PAKEJ 2- KOTA KINABALU, TUARAN DAN PENAMPANG |
KEMENTERIAN PENDIDIKAN MALAYSIA |
2,775,915.38 |
COMPLETED |
| 18 |
CADANGAN PELAKSANAAN PROJEK PEMBANGUNAN PENDIDIKAN RMKe-9 KEMENTERIAN PELAJARAN MALAYSIA PROJEK KHAS (DEWAN SEKOLAH, TANDAS SEKOLAH, PEJABAT GURU DAN PADANG SEKOLAH) PAKEJ 9 (SABAH DAN W.P LABUAN) SUB-PAKEJ 3-KOTA BELUD, KOTA MARUDU, TUARAN DAN PITAS |
KEMENTERIAN PENDIDIKAN MALAYSIA |
3,996,032.02 |
COMPLETED |
| 19 |
CADANGAN PELAKSANAAN PROJEK PEMBANGUNAN PENDIDIKAN RMKe-9 KEMENTERIAN PELAJARAN MALAYSIA PROJEK KHAS (DEWAN SEKOLAH, TANDAS SEKOLAH, PEJABAT GURU DAN PADANG SEKOLAH) PAKEJ 9 (SABAH DAN W.P LABUAN) SUB-PAKEJ 4- PAPAR, BEAUFORT DAN KENINGAU |
KEMENTERIAN PENDIDIKAN MALAYSIA |
4,421,508.67 |
COMPLETED |
| 20 |
CADANGAN PELAKSANAAN PROJEK PEMBANGUNAN PENDIDIKAN RMKe-9 KEMENTERIAN PELAJARAN MALAYSIA PROJEK KHAS (DEWAN SEKOLAH, TANDAS SEKOLAH, PEJABAT GURU DAN PADANG SEKOLAH) PAKEJ 9 (SABAH DAN W.P LABUAN) SUB-PAKEJ 5- SANDAKAN |
KEMENTERIAN PENDIDIKAN MALAYSIA |
1,738,170.26 |
COMPLETED |
| 21 |
CADANGAN PELAKSANAAN PROJEK PEMBANGUNAN PENDIDIKAN RMKe-9 KEMENTERIAN PELAJARAN MALAYSIA PROJEK KHAS (DEWAN SEKOLAH, TANDAS SEKOLAH, PEJABAT GURU DAN PADANG SEKOLAH) PAKEJ 9 (SABAH DAN W.P LABUAN) SUB-PAKEJ 6- SANDAKAN DAN KINABATANGAN |
KEMENTERIAN PENDIDIKAN MALAYSIA |
1,473,940.85 |
COMPLETED |
| 22 |
CADANGAN PELAKSANAAN PROJEK PEMBANGUNAN PENDIDIKAN RMKe-9 KEMENTERIAN PELAJARAN MALAYSIA PROJEK KHAS (DEWAN SEKOLAH, TANDAS SEKOLAH, PEJABAT GURU DAN PADANG SEKOLAH) PAKEJ 9 (SABAH DAN W.P LABUAN) SUB-PAKEJ 7- LAHAD DATU |
KEMENTERIAN PENDIDIKAN MALAYSIA |
4,208,690.46 |
COMPLETED |
| 23 |
CADANGAN PELAKSANAAN PROJEK PEMBANGUNAN PENDIDIKAN RMKe-9 KEMENTERIAN PELAJARAN MALAYSIA PROJEK KHAS (DEWAN SEKOLAH, TANDAS SEKOLAH, PEJABAT GURU DAN PADANG SEKOLAH) PAKEJ 9 (SABAH DAN W.P LABUAN) SUB-PAKEJ 8-KUNAK, SEMPORNA DAN TAWAU |
KEMENTERIAN PENDIDIKAN MALAYSIA |
1,955,894.27 |
COMPLETED |
| 24 |
CADANGAN PELAKSANAAN PROJEK PEMBANGUNAN PENDIDIKAN RMKe-9 KEMENTERIAN PELAJARAN MALAYSIA PROJEK KHAS (DEWAN SEKOLAH, TANDAS SEKOLAH, PEJABAT GURU DAN PADANG SEKOLAH) PAKEJ 9 (SABAH DAN W.P LABUAN) SUB-PAKEJ 9- W.P LABUAN |
KEMENTERIAN PENDIDIKAN MALAYSIA |
1,683,651.78 |
COMPLETED |
| 25 |
CADANGAN PELAKSANAAN PROJEK PEMBANGUNAN PENDIDIKAN RMKe-9 KEMENTERIAN PELAJARAN MALAYSIA PROJEK KHAS (DEWAN SEKOLAH, TANDAS SEKOLAH, PEJABAT GURU DAN PADANG SEKOLAH) PAKEJ 9 (SABAH DAN W.P LABUAN) SUB-PAKEJ 10-LABUAN |
KEMENTERIAN PENDIDIKAN MALAYSIA |
1,599,262.58 |
COMPLETED |
| 26 |
CADANGAN PELAKSANAAN PROJEK PEMBANGUNAN PENDIDIKAN RMKe-9 KEMENTERIAN PELAJARAN MALAYSIA PROJEK KHAS (DEWAN SEKOLAH, TANDAS SEKOLAH, PEJABAT GURU DAN PADANG SEKOLAH) PAKEJ 9 (SABAH DAN W.P LABUAN) SUB-PAKEJ 11- LABUAN |
KEMENTERIAN PENDIDIKAN MALAYSIA |
2,681,724.51 |
COMPLETED |
| 27 |
CADANGAN PELAKSANAAN PROJEK PEMBANGUNAN PENDIDIKAN RMKe-9 KEMENTERIAN PELAJARAN MALAYSIA PROJEK KHAS (DEWAN SEKOLAH, TANDAS SEKOLAH, PEJABAT GURU DAN PADANG SEKOLAH) PAKEJ 9 (SABAH DAN W.P LABUAN) SUB-PAKEJ 12- SIPITANG |
KEMENTERIAN PENDIDIKAN MALAYSIA |
745,608.94 |
COMPLETED |
| 28 |
CADANGAN PELAKSANAAN PROJEK PEMBANGUNAN PENDIDIKAN RMKe-9 KEMENTERIAN PELAJARAN MALAYSIA PROJEK KHAS (DEWAN SEKOLAH, TANDAS SEKOLAH, PEJABAT GURU DAN PADANG SEKOLAH) PAKEJ 9 (SABAH DAN W.P LABUAN) SUB-PAKEJ 13- RANAU DAN TELUPID |
KEMENTERIAN PENDIDIKAN MALAYSIA |
1,090,034.83 |
COMPLETED |
| 29 |
CADANGAN PELAKSANAAN PROJEK PEMBANGUNAN PENDIDIKAN RMKe-9 KEMENTERIAN PELAJARAN MALAYSIA PROJEK KHAS (DEWAN SEKOLAH, TANDAS SEKOLAH, PEJABAT GURU DAN PADANG SEKOLAH) PAKEJ 9 (SABAH DAN W.P LABUAN) SUB-PAKEJ 14- NABAWAN DAN TAWAU |
KEMENTERIAN PENDIDIKAN MALAYSIA |
2,008,446.00 |
COMPLETED |
| 30 |
CADANGAN PELAKSANAAN PROJEK PEMBANGUNAN PENDIDIKAN RMKe-9 KEMENTERIAN PELAJARAN MALAYSIA PROJEK KHAS (DEWAN SEKOLAH, TANDAS SEKOLAH, PEJABAT GURU DAN PADANG SEKOLAH) PAKEJ 9 (SABAH DAN W.P LABUAN) SUB-PAKEJ 15- PITAS, KOTA BELUD, KUDAT, KOTA KINABALU DAN BEAUFORT. |
KEMENTERIAN PENDIDIKAN MALAYSIA |
2,107,920.90 |
COMPLETED |
| 31 |
CADANGAN KERJA-KERJA KECEMASAN (AP173.2) UNTUK KERJA-KERJA PEMBAIKAN STRUKTUR BANGUNAN SEKOLAH DI SEKOLAH KEBANGSAAN BANDARAYA, KOTA KINABALU, SABAH |
KEMENTERIAN PENDIDIKAN MALAYSIA |
20,200,000.00 |
COMPLETED |
| 32 |
CADANGAN MEMBINA DAN MENYIAPKAN SEBUAH SEKOLAH MENENGAH KEBANGSAAN SIMPANGAN YANG MENGANDUNGI 12 BILIK DARJAH DAN KEMUDAHAN LAIN DI DAERAH PAITAN, BELURAN SABAH. |
KEMENTERIAN PENDIDIKAN MALAYSIA |
25,388,772.67 |
COMPLETED |
| 33 |
CADANGAN MEMBINA DAN MENYIAPKAN BANGUNAN PRA-SEKOLAH SERTA KEMUDAHAN BERKAITAN BAGI NEGERI SABAH UNTUK KEMENTERIAN PELAJARAN MALAYSIA DI BAWAH BIDANG KEBERHASILAN UTAMA NEGARA (NKRA) 2012 DAN 2013 PAKEJ 8D (1) & 8D (2) SUB-PAKEJ 8D (1) - PAPAR & MEMBAKUT |
KEMENTERIAN PENDIDIKAN MALAYSIA |
2,955,629.23 |
COMPLETED |
| 34 |
CADANGAN MEMBINA DAN MENYIAPKAN BANGUNAN PRA-SEKOLAH SERTA KEMUDAHAN BERKAITAN BAGI NEGERI SABAH UNTUK KEMENTERIAN PELAJARAN MALAYSIA DI BAWAH BIDANG KEBERHASILAN UTAMA NEGARA (NKRA) 2012 DAN 2013 PAKEJ 8D (1) & 8D (2) SUB-PAKEJ 8D (2) - TENOM, KENINGAU DAN TAMBUNAN |
KEMENTERIAN PENDIDIKAN MALAYSIA |
3,137,005.06 |
COMPLETED |
| 35 |
CADANGAN MEMBINA DAN MENYIAPKAN MAKTAB RENDAH SAINS MARA (MRSM) SEMPORNA, SABAH |
MAJLIS AMANAH RAKYAT |
49,087,305.76 |
COMPLETED |
| 36 |
CADANGAN KERJA-KERJA PEMBINAAN STRUKTUR BANGUNAN DAN LAIN-LAIN KEMUDAHAN BERKAITAN DI SM TEKNIK LIKAS, KOTA KINABALU, SABAH SECARA REKA DAN BINA |
KEMENTERIAN PENDIDIKAN MALAYSIA |
20,018,628.83 |
COMPLETED |
| 37 |
CADANGAN MEMBINA DAN MENYIAPKAN MAKTAB RENDAH SAINS MARA (MRSM) SEMPORNA, SABAH FASA 2 |
MAJLIS AMANAH RAKYAT |
14,741,191.30 |
COMPLETED |
| 38 |
CADANGAN RUMAH-RUMAH KAKITANGAN DAN BANGUNAN SETOR UNTUK SAFODA DI LUMAT, BEAUFORT SABAH |
SABAH FORESTRY DEVELOPMENT
AUTHORITY |
2,051,220.39 |
COMPLETED |
| 39 |
PROPOSED RESIDENTIAL DEVELOPMENT OF 9 BLOCKS (360 UNITS) OF 5 STOREY APARTMENT ON PART OF PL.226190290 AT KG LANGKON, DISTRICT OF KOTA MARUDU, SABAH |
PERBADANAN PR1MA MALAYSIA |
75,015,000.00 |
COMPLETED |
| 40 |
CADANGAN PEMBANGUNAN-PHYSICAL CAPEX-FASA 3A SABAH AGRO INDUSTRIAL PRECINT-SABAH DEVELOPMENT CORRIDOR (SAIP-SDC) DI DAERAH PAPAR,SABAH |
SABAH ECONOMIC DEVELOPMENT AND INVESTMENT AUTHORITY |
19,753,023.82 |
COMPLETED |
| 41 |
CADANGAN PEMBINAAN BALAI BOMBA DAN KUARTERS BALAI BOMBA DAN PENYELAMAT |
KEMENTERIAN PERUMAHAN DAN
KERAJAAN TEMPATAN |
4,000,000.00 |
COMPLETED |
| 42 |
CADANGAN PEMBINAAN 2 TINGKAT KEDAI/PEJABAT DI LOT 105334227 PEKAN BARU MEROTAI TAWAU, SABAH |
TETAP PERKASA SDN BHD |
7,232,115.75 |
COMPLETED |
| 43 |
CADANGAN PEMBINAAN KEMUDAHAN FASILITI LADANG BAGI PROJEK D.E. 2015 UNTUK BAGUNAN SHOWCASE AGRO-BIOENERGI DI FAKULTI PERTANIAN LESTARI (FPL) SANDAKAN, UNIVERSITI MALAYSIA SABAH |
UNIVERSITI MALAYSIA SABAH |
167,193.00 |
COMPLETED |
| 44 |
CADANGAN PEMBINAAN KEMUDAHAN FASILITI LADANG BAGI PROJEK D.E. 2015 UNTUK RUMAH PENGERINGAN BIOMASS HASIL TANAMAN DI FAKULTI PERTANIAN LESTARI (FPL) SANDAKAN, UNIVERSITI MALAYSIA SABAH |
UNIVERSITI MALAYSIA SABAH |
289,706.50 |
COMPLETED |
| 45 |
CADANGAN PEMBINAAN KEMUDAHAN FASILITI LADANG BAGI PROJEK D.E. 2015 UNTUK FASILITI PENYELIDIKAN CENDAWAN DI FAKULTI PERTANIAN LESTARI (FPL) SANDAKAN, UNIVERSITI MALAYSIA SABAH |
UNIVERSITI MALAYSIA SABAH |
253,329.93 |
COMPLETED |
| 46 |
CADANGAN PEMBINAAN KEMUDAHAN FASILITI LADANG BAGI PROJEK D.E. 2015 UNTUK BANGUNAN GALERI PENGEMBANGAN PERTANIAN/INFORMATION CENTRE DI FAKULTI PERTANIAN LESTARI (FPL) SANDAKAN, UNIVERSITI MALAYSIA SABAH |
UNIVERSITI MALAYSIA SABAH |
618,714.47 |
COMPLETED |
| 47 |
CADANGAN PEMBINAAN KEMUDAHAN FASILITI LADANG BAGI PROJEK D.E. 2015 UNTUK BANGUNAN UNIT INSECTARIUM DI FAKULTI PERTANIAN LESTARI (FPL) SANDAKAN, UNIVERSITI MALAYSIA SABAH |
UNIVERSITI MALAYSIA SABAH |
383,383.70 |
COMPLETED |
| 48 |
CADANGAN PEMBINAAN KEMUDAHAN FASILITI LADANG BAGI PROJEK D.E. 2015 UNTUK BANGSAL PEMPROSESAN DAN PASCATUAI DI FAKULTI PERTANIAN LESTARI (FPL) SANDAKAN, UNIVERSITI MALAYSIA SABAH |
UNIVERSITI MALAYSIA SABAH |
417,353.80 |
COMPLETED |
| 49 |
CADANGAN PEMBINAAN KEMUDAHAN FASILITI LADANG BAGI PROJEK D.E. 2015 UNTUK FASILITI PENGURUSAN SISA PEPEJAL DI FAKULTI PERTANIAN LESTARI (FPL) SANDAKAN, UNIVERSITI MALAYSIA SABAH |
UNIVERSITI MALAYSIA SABAH |
342,863.20 |
COMPLETED |
| 50 |
CADANGAN PROJEK PEMBANGUNAN FAKULTI PERTANIAN LESTARI (FPL) 2014 YANG MERANGKUMI BANGUNAN JENTERA DAN MEKANISASI LADANG, PARKIR JENTERA DAN KENDERAAN BERBUMBUNG, DEPOT BAHAN API, BANGUNAN CATTLE YARD, FIDLOT LEMBU, UNIT PEMERAHAN SUSU, RUMAH ANAK LEMBU DAN BANGUNAN PEMPROSESAN MAKANAN TERNAKAN SECARA REKA DAN BINA |
UNIVERSITI MALAYSIA SABAH |
3,561,600.00 |
COMPLETED |
| 51 |
CADANGAN PEMBANGUNAN PHYSICAL CAPEX FASA 4 SABAH AGRO INDUSTRIAL PRECINT - SABAH DEVELOPMENT CORRIDOR SAIP-SDC |
SABAH ECONOMIC DEVELOPMENT AND INVESTMENT AUTHORITY |
29,112,749.45 |
COMPLETED |
| 52 |
PROJEK PUSAT PAKAR PERGIGIAN, KOTA KINABALU |
JABATAN KERJA RAYA SABAH |
30,000,000.00 |
COMPLETED |
| 53 |
TAWARAN SEMULA CADANGAN PEMBINAAN KEMUDAHAN FASILITI LADANG BAGI RUMAH PENYEMBELIHAN DI FAKULTI PERTANIAN LESTARI (FPL) SANDAKAN, UNIVERSITI MALAYSIA SABAH |
UNIVERSITI MALAYSIA SABAH |
372,389.00 |
COMPLETED |
| 54 |
CADANGAN KERJA-KERJA UBAHSUAI BANGUNAN KAMPUS BAGI KAMPUS SEMENTARA KOLEJ PROFESIONAL MARA (KPM) BEAUFORT, SABAH |
MAJLIS AMANAH RAKYAT |
276,600.00 |
COMPLETED |
| 55 |
PROJEK NAIKTARAF KOMPLEKS SUKAN BELURAN TAHUN 2021 |
KEMENTERIAN BELIA DAN SUKAN SABAH |
749,655.00 |
COMPLETED |
| 56 |
CADANGAN PEMBINAAN BALAI BOMBA DAN KUARTERS BALAI BOMBA DAN PENYELAMAT (TENDER SEMULA) |
KEMENTERIAN PERUMAHAN DAN
KERAJAAN TEMPATAN |
2,457,837.00 |
COMPLETED |
| 57 |
PROPOSED UPGRADING OF INFRASTRUCTURE TO EXISTING SABAH CULTURAL CENTRE, OFF JALAN PENAMPANG-TAMBUNAN, PENAMPANG, SABAH |
LEMBAGA KEBUDAYAAN NEGERI SABAH |
1,729,961.66 |
COMPLETED |
| 58 |
PROJEK PEMBAIKAN CERUN DI KM 5.90, JALAN MALINSAU SAMBAH, TUARAN, SABAH |
JABATAN KERJA RAYA SABAH |
4,407,041.50 |
COMPLETED |
| 59 |
PEMBINAAN GANTIAN PENUH 24 BILIK DARJAH DAN LAIN-LAIN KEMUDAHAN BERKAITAN SEKOLAH MENENGAH KEBANGSAAN KUNDASANG, RANAU SABAH |
KEMENTERIAN PENDIDIKAN MALAYSIA |
30,807,730.00 |
ON-GOING |
| 60 |
PELAKSANAAN PROJEK LEBUHRAYA PAN BORNEO SABAH - WP30 MENAIKTARAF JALAN DARI SAPI NANGOH KE SG BAOTO |
JABATAN KERJA RAYA SABAH |
252,133,771.14 |
ON-GOING |
| 61 |
PROJEK DAIF SABAH (2020) – GANTIAN 24 BILIK DARJAH, BANGUNAN PENTADBIRAN DAN MAKMAL SAINS DI SK UMAS-UMAS, SABAH |
JABATAN KERJA RAYA MALAYSIA |
31,810,602.31 |
ON-GOING |
| 62 |
PEMBINAAN JETI MAWILLA 2, SANDAKAN, SABAH (REKA DAN BINA) |
JABATAN KERJA RAYA MALAYSIA |
122,999,990.00 |
ON-GOING |
| 63 |
PEMBINAAN DAN PEMASANGAN BEKALAN AIR TELAGA TIUB DI SABAH BAGI PAKEJ 1 (16 PROJEK) |
JABATAN KERJA RAYA MALAYSIA |
16,005,704.25 |
ON-GOING |
| 64 |
PEMBINAAN DAN PEMASANGAN BEKALAN AIR TELAGA TIUB DI SABAH BAGI PAKEJ 2 (16 PROJEK) |
JABATAN KERJA RAYA MALAYSIA |
16,428,538.00 |
ON-GOING |
| 65 |
PEMBINAAN DAN PEMASANGAN BEKALAN AIR TELAGA TIUB DI SABAH BAGI PAKEJ 3 (16 PROJEK) (REKA DAN BINA) |
JABATAN KERJA RAYA MALAYSIA |
14,079,015.55 |
ON-GOING |
| 66 |
PEMBINAAN DAN PEMASANGAN BEKALAN AIR TELAGA TIUB DI SABAH BAGI PAKEJ 4 (13 PROJEK) |
JABATAN KERJA RAYA MALAYSIA |
11,964,599.25 |
ON-GOING |
| 67 |
PROPOSED COMMERCIAL DEVELOPMENT OF 42 LOTS OF 2-STOREY SHOP/OFFICE (WITH SUBSIDIARY STRATA TITLE TO BE APPLIED FOR) ON NT 213194480 AT KG. NAMBAZAN, JALAN PAPAR LAMA, DISTRICT OF PENAMPANG, SABAH. |
KOPORIM DEVELOPMENT SDN BHD |
15,567,443.40 |
ON-GOING |
| 68 |
PROPOSED DEVELOPMENT OF 1 BLOCK OF HOTEL AT LOT 015679320, OFF JALAN COASTAL, DISTRICT OF KOTA KINABALU |
GRAND LIBERTY SDN. BHD |
85,650,000.00 |
ON-GOING |
| 69 |
LEBUHRAYA PAN BORNEO SABAH FASA 1B: WP25 - MENAIK TARAF JALAN DARI KAMPUNG PERPADUAN DATUK MOH KE SUKAU |
JABATAN KERJA RAYA SABAH |
344,298,593.98 |
ON-GOING |
| 70 |
LEBUHRAYA PAN BORNEO SABAH FASA 1B: WP26 - MENAIKTARAF JALAN DARI SUKAU KE KAMPUNG LOT M |
JABATAN KERJA RAYA SABAH |
488,333,163.59 |
ON-GOING |
| 71 |
JPPKK PEMBINAAN KAMSIS POLITEKNIK SANDAKAN, SABAH (REKA & BINA) |
JABATAN KERJA RAYA SABAH |
39,951,000.00 |
ON-GOING |
| 72 |
PEMBINAAN DAN PEMASANGAN BEKALAN AIR TELAGA TIUB (REKA & BINA) DI SK GERAS, TAMBUNAN, SABAH |
JABATAN KERJA RAYA SABAH |
2,112,034.00 |
ON-GOING |
| 73 |
PROPOSED RENOVATION KINABALU WING GUESTROOMS, TANJUNG WING & KINABALU WING LOBBY, PUBLIC CIRCULATION, CHINESE RESTAURANT & SPECIALTY RESTAURANT, HEALTH CLUB, STAR LOUNGE, KID'S CLUB, NEW POOL, MAIN HOTEL POOL & OUTDOOR WET PLAY AREA, INCLUDING SPLAST PAD WITH SUPPORTING FACILITIES |
TANJUNG ARU HOTEL SDN BHD |
197,000,000.00 |
ON-GOING |
| 74 |
DAIF SABAH (2024) - PEMBINAAN SEMULA BANGUNAN DAIF DI SEKOLAH KEBANGSAAN PIASAU, KOTA BELUD, SABAH (XBA5330) |
JABATAN KERJA RAYA SABAH |
22,000,000.00 |
PRE- CONTRACT |
| 75 |
DAIF SABAH (2024) - PEMBINAAN SEMULA BANGUNAN DAIF DI SEKOLAH KEBANGSAAN BUKIT BALACON, LAHAD DATU, SABAH (XBA3137) |
JABATAN KERJA RAYA SABAH |
20,000,000.00 |
PRE- CONTRACT |
| 76 |
DAIF SABAH (2025) - PEMBINAAN SEMULA BANGUNAN DAIF DAN BANGUNAN TAMBAHAN DI SEKOLAH KEBANGSAAN TAKULI, BEAUFORT, SABAH (XBA6059) |
JABATAN KERJA RAYA SABAH |
23,000,000.00 |
PRE- CONTRACT |